Experience


Disclaimer: Only a very small number of tanks are tipped over, most are dismantled by a crane.
Iseler Demolition Crew

Iseler Demolition Inc. is adept at dealing with varying site conditions. If a site is wide open, the tower can be tipped over like a tree.
Or, on a site where space is restricted, our team works alongside a skilled crane operator with surgical precision to dismantle the tower piece by piece. We might also cover buildings adjacent to the tower with tarps to protect them from spark damage, or cover delicate lawn and asphalt with plastic or plywood to preserve their appearance.

” We believed that this job would be difficult because of the tight location with the tower only six feet from the building. Your crews concern for safety of the plant and themselves was unquestionably their priority.”
Essex Group Inc. – Orleans, IN
75,000 Gallon Elevated Tower

Iseler Demolition Inc. has completed projects dealing with all styles of water containers as well as other steel structures.

  • Tanks ranging in size from 9,000 gallons to 5,000,000 gallons
  • Dismantles by crane, tipover or manlift
  • Elevated Water Towers
  • Ellipsoids/Spheroids
  • Standpipes
  • Ground Storage Tanks
  • Fuel Tanks
  • Grain Dryers
  • Radio Antennas
  • Digester Tanks
  • Fluted Columns
  • Steel Tank Roof Removal